Slough primary - Trench work Client - Brush Power Solutions Ltd

Task: To extend the cable trench within the 33kv switch room building.

Due to dust and vibration constraints we were able to use water suppression and core drill through the existing slab in succession. We then removed a section of floor without the need for concrete breakers or dust, using a bespoke shutter we reformed the trench and made good the floor before supplying new hardwood trench boards. 